Chapter II
Qualification Progress Record of: ______________________________________
DATE REPORTED ________________________________
OFFICER/
SKETCH OR PRACTICAL # P.O. SIGNATURE DATE
FIRST MONTH
Topside and Bridge Arrangement (1) ______________________________ _________
Tank Arrangement (2) ______________________________ _________
Damage Control Equipment (3) ______________________________ _________
Trim and Drain System (4) ______________________________ _________
Qualify as a Topside Watch (5) ______________________________ _________
Qualify as Lookout/Helm/Planes (6) ______________________________ _________
Qualify as Trim Manifold Operator (7) ______________________________ _________
Chief Petty Officer Examination (8) ______________________________ _________
Officer Examination (9) ______________________________ _________
SECOND MONTH
Fresh Water & Distilling System (10) ______________________________ _________
Battery Water System (11) ______________________________ _________
High Pressure Air System (12) ______________________________ _________
Main Ballastd Blow System (13) ______________________________ _________
Ship's Service Air System (14) ______________________________ _________
Low Pressure Blow System (15) ______________________________ ________
Qualify on the Air Manifold (16) ______________________________ _________
Chief Petty Officer Examination (17) ______________________________ _________
Officer Examination (18) ______________________________ _________
THIRD MONTH
Sanitary Tank System (19) ______________________________ _________
Main & Mast Hydraulics (20) ______________________________ _________
Steering, Bow & Stern Planes (21) ______________________________ _________
Blow all Sanitary Tanks (22) _______________________________ _________
PMS (23) ______________________________ _________
Chief Petty Officer Examination (24) ______________________________ _________
Officer Examination (25) ______________________________ _________
FOURTH MONTH
Fuel Filling & Compensating Water (26) ______________________________ _________
Ventilation System (27) ______________________________ _________
Snorkel System (28) ______________________________ _________
Snorkel Safety Circuits (29) ______________________________ _________
Main Propulsion System (30) ______________________________ _________
Chief Petty Officer Examination (31) ______________________________ _________
Officer Examination (32) ______________________________ _________
II-1